Immersed Tube Tunnels - Foundations

Diver Instalation
Aktio Preveza, Greece

Precast tunnel sections are floated out to position, and before final immersion have Fabriform™ bags fixed by divers to their underside.

These bags are then pump filled with Grout or Micro Concrete while the tunnel section is held in its final position on hydraulic jacks. Once the grout has set the jacks are removed and the tunnel location is fixed. This system has a variety of uses, from helping to prevent the effects of bed material liquefaction due to earthquake action, to simple structural strip foundations.

Bed Grout Mattress System, Aktio Preveza Tunnel, Greece
Aktio Preveza, Greece


The modular design of panels and matts allows for any size of tunnel to be catered for, and the innovate filling/ venting system ensures total filling from the centre outwards.

 


















Engineering, underwater engineering, grout bags, proserve, proserve ltd, proserve limited, fabriform, fabric formwork, revetment, revetments, scour repair, underscour, slope stabilisation, underwater, cement, concrete, bearings, seals, channels lining, pipe protection, piles, outfalls, lagoons, cofferdams, caisons engineering, underwater engineering, grout bags, proserve, proserve ltd, proserve limited, fabriform, fabric formwork, revetment, revetments, scour repair, underscour, slope stabilisation, underwater, cement, concrete, bearings, seals, channel lining, pipe protection, piles, outfalls, lagoons, cofferdams, caissons